首页> 美国政府科技报告 >Practical Experience Gained During the First Twenty Years of Operation of the Great Plains Gasification Plant and Implications for Future Projects.
【24h】

Practical Experience Gained During the First Twenty Years of Operation of the Great Plains Gasification Plant and Implications for Future Projects.

机译:大平原气化厂运营前20年取得的实践经验及对未来项目的启示。

获取原文

摘要

The Dakota Gasification Company's (DGC) Great Plains Synfuels Plant (GPSP) in Beulah, North Dakota has operated successfully for 20 years as the only commercial coal-to-natural gas facility in the United States. The experience gained during those 20 years has created an opportunity to benefit from a fully proven technology base. This document is intended to capture what the first 20 years of the plants operation has taught operators about a synthetic natural gas from coal production facility. This information is expected to aid in the design, construction, and operation of future coal gasification facilities. The plants success has not been achieved without some changes and alterations over its lifetime. The sources for this report, which include past technical reports and interviews with plant operators and managers, revealed that most parts of the original plant design worked well, but a few did not. Many processes in the plant have undergone redesign, repair, or improvement. These changes have made the plant much more productive, efficient, and environmentally sound than even its designers envisioned.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号