首页> 美国政府科技报告 >Pilot Region-Based Optimization Program for Fund-Lead Sites in EPA Region 3. Site Optimization Tracker: Crossley Farm Superfund Site Hereford and Washington Townships, Berks County, Pennsylvania:Final rept
【24h】

Pilot Region-Based Optimization Program for Fund-Lead Sites in EPA Region 3. Site Optimization Tracker: Crossley Farm Superfund Site Hereford and Washington Townships, Berks County, Pennsylvania:Final rept

机译:基于试点地区的Epa地区基金牵头地点优化计划3.网站优化跟踪器:Crossley农场超级基金网站宾夕法尼亚州伯克斯县赫里福德和华盛顿乡镇:最终报告

获取原文

摘要

Once hydraulic containment is established for the downgradient plume, source removal options should once again be considered. However, the optimization team cautions against expenditure on any source removal technology without a clear understanding of how the technology will hasten progress to site closure and without guarantees of performance from vendors. If the application of a technology will remove mass but not speed up site cleanup (because significant mass still remains as a continuing source of dissolved ground water impacts), then implementing that technology is of questionable value. Pilot testing should only be performed on aggressive source remediation technologies after an evaluation has been performed to determine that scale-up to full-scale implementation is feasible from a cost perspective.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号