首页> 美国政府科技报告 >Development of Methods to Determine Lateral Effect of Highway Drainage Systems on Wetland Hydrology - Phase 2:Final rept. (July 2004 - June 2006)
【24h】

Development of Methods to Determine Lateral Effect of Highway Drainage Systems on Wetland Hydrology - Phase 2:Final rept. (July 2004 - June 2006)

机译:确定公路排水系统湿地水文侧向影响的方法的发展 - 第2阶段:最终评估。 (2004年7月 - 2006年6月)

获取原文

摘要

A method was developed in the first phase of this project to predict the lateral effect of a drainage ditch on adjacent wetland hydrology. The method predicts the distance of influence of a single ditch constructed through a wetland, i.e. the width of a strip adjacent to the ditch that is drained such that it would no longer satisfy wetland hydrologic criteria, in terms of T25 values which are dependent on climatological conditions. Main objectives of the second phase were to complete determination of the T25values and to test the validity of the method.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号