首页> 美国政府科技报告 >Integrated Corridor Management. Concept Development and Foundational Research. Task 3.2-DEvelop Criteria for Delinating a Corridor; Technical Memorandum
【24h】

Integrated Corridor Management. Concept Development and Foundational Research. Task 3.2-DEvelop Criteria for Delinating a Corridor; Technical Memorandum

机译:综合走廊管理。概念发展与基础研究。任务3.2-划定走廊的发展标准;技术备忘录

获取原文

摘要

Task 3 involves overall foundational research to further the understanding of various aspects of Integrated Corridor Management (ICM) and to identify integration issues needed to evaluate the feasibility of the ICM initiative. The focus of Task 3.2 and the purpose of this document (TM 3.2) to develop criteria for delineating the boundaries of a corridor and possible approaches/methodologies for using the criteria to identify the boundaries of a corridor and corresponding issues.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号