首页> 美国政府科技报告 >Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Arnold Brook Lake-Presque Isle, Aroostook County, Maine. Arnold Brook Lake PCAP-TMDL Report, Maine DEPLW 0813.
【24h】

Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Arnold Brook Lake-Presque Isle, Aroostook County, Maine. Arnold Brook Lake PCAP-TMDL Report, Maine DEPLW 0813.

机译:磷控制行动计划和每日总磷(年磷)负荷报告:缅因州aroostook县的arnold Brook Lake-presque岛。 arnold Brook Lake pCap-TmDL报告,缅因州DEpLW 0813。

获取原文

摘要

The objectives of this project were twofold: First, a comprehensive land use inventory was undertaken to assist Maine DEP in developing a Phosphorus Control Action Plan (PCAP) and a Total Maximum Daily Load (TMDL) report for the Arnold Brook Lake watershed. Simply stated, a TMDL is the total amount of phosphorus that a lake can receive without harming water quality. Maine DEP, with assistance from the MACD, will fully address and incorporate public comments before final submission to the US EPA. Secondly, watershed assessment work was conducted by the Maine DEP-MACD project team to help assess total phosphorus reduction techniques that would be beneficial for the Arnold Brook Lake watershed. The results of this assessment include recommendations for future conservation work in the watershed to help citizens, organizations, and agencies restore and protect Arnold Brook Lake.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号