Defense Acquisitions: Navy Faces Challenges Constructing the Aircraft Carrier Gerald R. Ford within Budget

机译:国防采办:海军面临挑战在预算范围内建造航母Gerald R. Ford

获取原文

摘要

The Navy is investing over $3 billion to develop technologies for a new type of aircraft carrier--the Ford class--and it expects to spend almost $11 billion to design and construct the USS Gerald R. Ford (CVN 78)--the lead ship of the class. New technologies are to improve the carrier's performance and reduce crew size. The Navy requested authorization of CVN 78 in its fiscal year 2008 budget. GAO was asked to assess the Navy's ability to meet its goals for developing the new carrier. Specifically, this report assesses (1) the extent to which technology development could affect the capability and construction of CVN 78, (2) the status of efforts to achieve design stability, and (3) the challenges to building CVN 78 within budget. To accomplish this, our work includes analysis of test reports, development schedules, and ship progress reviews; interviews with Navy and other officials; and examinations of cost estimates and our own past work. Delays in technology development may lead to increases in CVN 78's planned construction costs and potential reductions in the ship's capability at delivery. CVN 78's success depends on on-time delivery and insertion of fully mature and operational technologies in order to manage construction costs and enhance ship capabilities.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号