首页> 美国政府科技报告 >Technology Readiness Assessment for the Waste Treatment and Immobilization Plant (WTP) Analytical Laboratory, Balance of Facilities and LAW Waste Vitrification Facilities.
【24h】

Technology Readiness Assessment for the Waste Treatment and Immobilization Plant (WTP) Analytical Laboratory, Balance of Facilities and LAW Waste Vitrification Facilities.

机译:废物处理和固定化植物(WTp)分析实验室,设施平衡和法律废物玻璃化设施的技术准备评估。

获取原文

摘要

The U.S. Department of Energy (DOE), Office of River Protection (ORP) and the DOE Office of Environmental Management (EM), Office of Project Recovery have completed a Technology Readiness Assessment (TRA) for three Hanford Waste Treatment and Immobilization Plant (WTP) facilities; Analytical Laboratory (LAB), Balance of Facilities (BOF), and Low-Activity Waste Vitrification Facility (LAW). The purpose of this assessment was to determine if the maturity of critical technology elements (CTE) is sufficient to be incorporated into the final design of these facilities. The methodology used for this TRA was based upon detailed guidance for conducting TRAs contained in the Department of Defense, Technology Readiness Assessment Deskbook1. The assessment utilized a slightly modified version of the Technology Readiness Level (TRL) Calculator2 originally developed by Nolte et al. (2003) to determine the TRL for the CTE. Mr. Nolte was present during the initial TRA sessions and guided the Assessment Team through the use of the TRL Calculator; Mr. Nolte also reviewed this report.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号