首页> 美国政府科技报告 >Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Long Pond-Belgrade, Rome and Mount Vernon, Kennebec County, Maine. Long Pond PCAP-TMDL Report, Maine DEPLW 0888.
【24h】

Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Long Pond-Belgrade, Rome and Mount Vernon, Kennebec County, Maine. Long Pond PCAP-TMDL Report, Maine DEPLW 0888.

机译:磷控制行动计划和每日总磷(年磷)负荷报告:长池 - 贝尔格莱德,罗马和芒特弗农,肯纳贝克县,缅因州。 Long pond pCap-TmDL报告,缅因州DEpLW 0888。

获取原文

摘要

The objectives of this project were twofold: First, a comprehensive land use inventory was undertaken by the Colby College Environmental Assessment Team (CEAT) to assist Maine DEP in developing a Phosphorus Control Action Plan (PCAP) and a Total Maximum Daily Load (TMDL) report for the Long Pond watershed. Simply stated, a TMDL is the total amount of phosphorus that a lake can receive without harming water quality. Maine DEP, with assistance from FB Environmental staff, will fully address and incorporate public comments before final submission to the US EPA. Secondly, watershed assessment work was conducted by CEAT to help assess total phosphorus reduction techniques that would be beneficial for the Long Pond watershed. The results of this assessment include recommendations for future conservation work in the watershed to help citizens, organizations, and agencies restore and protect Long Pond.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号