首页> 美国政府科技报告 >Assessing Roof Fall Hazards for Underground Stone Mines: A Proposed Methodology
【24h】

Assessing Roof Fall Hazards for Underground Stone Mines: A Proposed Methodology

机译:评估地下石矿的屋顶坠落危险:建议的方法

获取原文

摘要

The potential for roof falls in underground mines remains a clear and present danger for mine workers. An investigation of ground conditions in nearly 50% of the nation's underground stone mines found that the state of roof stability is primarily determined in a limited and subjective manner. These large opening mines, with roof heights typically of 7 m or more, make physical observation difficult. Although some mines use monitoring techniques to gain additional information on roof stability, this practice is usually short-term and localized to address ground conditions in a particular section or part of the mine. A methodology to assess the risk for a roof fall is proposed in a preliminary fashion based on engineering judgment acquired from extensive underground stone mine experience and examination of related literature. The proposed method utilizes an observational technique to identify the risk of roof falls in three categories. Case study scenarios provide a realistic picture of model implementation. Providing the mine level decision maker with an accurate assessment tool to ascertain the level of risk related to ground conditions is expected to reduce mine worker injuries and fatalities. Moreover, the presences of danger can be overcome with a clear picture of quantified ground conditions.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号