首页> 美国政府科技报告 >Design Parameters of Roof Support Systems for Pre-Driven Longwall Recovery Rooms
【24h】

Design Parameters of Roof Support Systems for Pre-Driven Longwall Recovery Rooms

机译:预驱动长壁修复室顶板支撑系统设计参数

获取原文

摘要

Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use predriven longwall recovery rooms. The recovery entry is developed at the longwall stop position and supported ahead of time so that the required combinations of standing and internal supports can be installed before the longwall face approaches. A calibrated three-dimensional finite element model, developed in conjunction with an underground test area, provided the critical components and design principals for a comprehensive parametric study. The study indicates that vertical, horizontal, and shear stresses concentrated on the outby abutment pillar corner of the recovery room resulting in deformations in the immediate roof above the primary roof support anchorage level.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号