首页> 美国政府科技报告 >Highway-Railway At-Grade Crossings: Long-Term Settlement Measurements and Assessments
【24h】

Highway-Railway At-Grade Crossings: Long-Term Settlement Measurements and Assessments

机译:公路铁路平面交叉口:长期定居测量和评估

获取原文

摘要

The purpose of this research was to evaluate the long-term settlements for a wide variety of at-grade crossings. Twenty-four highway crossings were monitored to determine the effects of enhanced support on minimizing long-term settlements of the crossing surfaces. Settlements of the rail and highway approaches to the crossing areas were compared to settlements of the common crossing areas over an average service period of three years. Long-term settlements of crossings with traditional all-granular support materials were compared to crossings with enhanced support. The enhanced support was provided by substituting a layer of asphalt (termed underlayment) for the all-granular subballast layer. The trackbed crossings underlain with asphalt settled 41% of the amount for the all-granular supported trackbed crossings. In addition, the crossing areas underlain with asphalt settled 44% of the abutting allgranular supported track approaches. The statistical t-test validated the significance of the differential findings. Settlements of the all-granular track approaches to the crossings were statistically similar to each other and to the settlements of the all-granular crossing areas.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号