首页> 美国政府科技报告 >Proceedings of the Special International Workshop on Seismic Connection Details for Segmental Bridge Construction Held in Seattle, Washington, on July 22-24, 2009
【24h】

Proceedings of the Special International Workshop on Seismic Connection Details for Segmental Bridge Construction Held in Seattle, Washington, on July 22-24, 2009

机译:2009年7月22日至24日在华盛顿州西雅图举行的分段桥梁施工抗震连接详情国际研讨会论文集

获取原文

摘要

Using precast/prestressed concrete components to accelerate the construction of highway bridges has been a major professional thrust of the bridge engineering community. Rapid construction leads to many positive effects on costs, quality and safety. Thus, accelerated bridge construction (ABC) has become a popular option for both new installations and in bridge rehabilitation projects. ABC covers a broad spectrum of activities, including the development of high performance materials; fabrication processes; design, construction and erection methods; and techniques and equipment for transportation, installation, removal and reuse of existing bridges. Additionally, ABC can reduce negative environmental impacts and detour times due to new bridge construction and/or retrofit projects.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号