首页> 美国政府科技报告 >Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Fly Ash Pond Dam, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft
【24h】

Coal Combustion Waste Impoundment (Task 3) Dam Assessment Report: E.W. Brown Plant, Main Fly Ash Pond Dam, E.ON U.S. LLC, Harrodsburg, Kentucky. Draft

机译:燃煤废物蓄水(任务3)大坝评估报告:E.W。布朗工厂,主要飞灰池坝,E.ON美国有限责任公司,哈罗兹堡,肯塔基州。草案

获取原文

摘要

The release of over five million cubic yards of coal ash from the Tennessee Valley Authority's Kingston, Tennessee, facility in December 2008, which flooded more than 300 acres of land, damaging homes and property, is a wake-up call for diligence on coal combustion waste disposal units. The government and utilities must marshal best efforts to prevent such catastrophic failure and damage. A first step toward this goal is to assess the stability and functionality of the ash impoundments and other units, then quickly take any needed corrective measures. This assessment of the stability and functionality of the E. W. Brown Main Fly Ash Dam management unit is based on a review of available documents and on the site assessment conducted by Dewberry personnel on Tuesday, October 20, 2009. Dewberry found the supporting technical documentation adequate (Section 1.1.3). As detailed in Section 1.2.6, there are recommendations that may help to maintain a safe and trouble-free operation; Dewberry recommends an updated dam break analysis (currently in progress).

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号