首页> 美国政府科技报告 >Coal Ash Impoundment Specific Site Assessment Report: Westar Energy, Jeffrey Energy Center, Bottom Ash Lake Dam, Bottom Ash Pond Dam
【24h】

Coal Ash Impoundment Specific Site Assessment Report: Westar Energy, Jeffrey Energy Center, Bottom Ash Lake Dam, Bottom Ash Pond Dam

机译:煤灰蓄水特定场地评估报告:Westar Energy,Jeffrey能源中心,底灰湖坝,底灰池坝

获取原文

摘要

This report presents the results of a specific site assessment of the dam safety of Bottom Ash Lake Dam and Bottom Ash Pond Dam coal combustion waste impoundments at Westar Energy, Jeffrey Energy Center. This report presents information for Bottom Ash Pond Dam coal combustion waste impoundment because failure of this dam could potentially jeopardize the dam safety of Bottom Ash Lake Dam or cause an uncontrolled release of coal combustion waste through the spillway and into downstream waters.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号