首页> 美国政府科技报告 >Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Draft Report, Allegheny Energy, R. Paul Smith Station, Williamsport, Maryland
【24h】

Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Draft Report, Allegheny Energy, R. Paul Smith Station, Williamsport, Maryland

机译:大坝安全煤燃烧表面蓄水评估(任务3)报告草案,allegheny Energy,R。paul smith站,马里兰州威廉斯波特

获取原文

摘要

CHA was contracted by Lockheed Martin (a contractor to the United States Environmental Protection Agency) to perform site assessments of selected coal combustion surface impoundments (Project 0-381 Coal Combustion Surface Impoundments/Dam Safety Inspections). As part of this contract, CHA was assigned to perform a site assessment of Allegheny Energys Ash Pond 3 and Ash Pond 4 at the R. Paul Smith Power Station. The Power Station is located in Williamsport, Maryland, and the ash lagoons are in Falling Waters, West Virginia as shown on Figure 1 Project Location Map. CHA made a site visit on October 20, 2009 to inventory coal combustion surface impoundments at the facility, perform visual observations of the containment dikes, and collect relevant information regarding the site assessment.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号