Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Draft Report, American Electric Power, Muskingum River Power Plant, Waterford, Ohio

机译:大坝安全煤燃烧表面蓄水评估(任务3)报告草案,美国电力,马斯金根河电厂,沃特福德,俄亥俄州

获取原文

摘要

CHA was contracted by Lockheed Martin (a contractor to the United States Environmental Protection Agency) to perform site assessments of selected coal combustion surface impoundments (Project 0-381 Coal Combustion Surface Impoundments/Dam Safety Inspections). As part of this contract, CHA was assigned to perform a site assessment of the Ash Reservoir Complex and the Units 1-4 Bottom Ash Pond. CHA made a site visit to the Muskingum River Power Plant on October 21, 2009 and October 22, 2009 to inventory coal combustion surface impoundments at the facility, perform visual observations of the containment dams and dikes, and collect relevant information.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号