Coal Combustion Waste Impoundment Dam Assessment Report Site 25 Fly Ash Pond and Bottom Ash Pond American Electric Power Philip Sporn Generating Plant New Haven, West Virginia. (Final Report)

机译:煤燃烧废物蓄水坝评估报告现场25粉煤灰池塘和底灰池美国电力菲利普斯波恩发电厂西弗吉尼亚州纽黑文。 (总结报告)

获取原文

摘要

The release of over 5 million cubic yards of coal ash from the Tennessee Valley Authority's Kingston, Tennessee, facility in December 2008 serves as an important reminder of the need for our continued diligence on disposal units where coal combustion wastes are managed. The coal ash from the facility flooded more than 300 acres of land, damaging homes and property. It is critical that we all work to the best of our abilities to prevent a similar catastrophic failure and resultant environmental damage. One of the first steps in this effort is to assess the stability of the impoundments and similar units that contain coal combustion residuals and by-products to determine if and where corrective measures may be needed and then to carry out those measures as expeditiously as possible. This report for the American Electric Power Philip Sporn Generating Plant facility assesses the stability and functionality of the fly ash and bottom ash management units. This evaluation is based on a site assessment conducted on Thursday, September 3rd, 2009 by Dewberry & Davis, Inc professional engineers.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号