首页> 美国政府科技报告 >Synthesis on Construction Unit Cost Development: Technical Report
【24h】

Synthesis on Construction Unit Cost Development: Technical Report

机译:建设单位成本开发综合:技术报告

获取原文

摘要

Availability of historical unit cost data is an important factor in developing accurate project cost estimates. State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, material costs, and equipment costs, including contractor overhead and profit. The goal of this synthesis is to identify how state highway agencies develop unit prices for construction and maintenance projects. The synthesis approach consists of a comprehensive online survey, covering every aspect of unit cost development, to identify the state of practice in state highway agencies and interviews with several representative SHAs to gain a better understanding of the practices followed for unit cost development. This study finds that even though SHAs collect and store historical cost data, they do not have a formal and documented process for adjusting unit costs for project characteristics and market conditions.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号