首页> 美国政府科技报告 >Rubblization and Base Overlay of FM 912 and FM 1155
【24h】

Rubblization and Base Overlay of FM 912 and FM 1155

机译:Fm 912和Fm 1155的Rubblization和Base Overlay

获取原文

摘要

In many instances rubblization may be a good option to convert a deteriorated concrete pavement into a flexible pavement structure. In this project, the Texas Department of Transportation conducted rubblization on portions of a concrete pavement originally constructed in the 1920s to validate project analysis and construction specifications. This project truly pushed the limit with respect to how poor the concrete pavement support can be before rubblization is not a viable option. Fortunately, project personnel knew from the start that this project was a marginal candidate for rubblization, so contingency plans were already in place. Rubblization on this project showed that the project analysis procedures and construction specification worked well. These procedures and specification are included in this report as Appendices A and B, respectively, and should be used for planning and controlling construction of future rubblization projects. Post-construction monitoring revealed no differences in ride existed among the sections of differing treatments. The main structural differences observed were between sections rubblized with different equipment. The sections rubblized with Type II equipment had rubblized and base layer modulus values greater than those observed in the section where Type I equipment was used.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号