首页> 美国政府科技报告 >Watershed Survey and Pilot LCC Project. A Final Report to The Piscataqua Region Estuaries Partnership
【24h】

Watershed Survey and Pilot LCC Project. A Final Report to The Piscataqua Region Estuaries Partnership

机译:流域调查和试点LCC项目。 piscataqua地区河口伙伴关系的最终报告

获取原文

摘要

A watershed survey of the Depot Pond and a soil erosion reduction project at the Milton Town Beach were completed in 2010, as part of a comprehensive watershed-based Lake Management Plan for the Milton Three Ponds of Milton NH and Lebanon ME. The watershed survey was accomplished by Three Ponds Protective Association (TPPA) member volunteers assisted by professionals. The professionals served as surveyor trainers, survey team leaders, and technical reviewers. The soil erosion project was accomplished as a pilot Lake Conservation Corps (LCC) project. It consisted of installing three rain gardens, a water retention basin, and two sets of infiltrations steps. Much of the work was done by a team of students from Nute High School.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号