首页> 美国政府科技报告 >Construction Monitoring of Full-Depth Reclamation in Madison County for MDOT Project No. NH-0008-03(032)
【24h】

Construction Monitoring of Full-Depth Reclamation in Madison County for MDOT Project No. NH-0008-03(032)

机译:麦迪逊县全深度填海工程监测计划编号为NH-0008-03(032)

获取原文

摘要

This report presents the results of construction monitoring of the full-depth reclamation (FDR) process used on MDOT project number NH-0008-03(032) in Madison County on US49. FDR is a method of pavement rehabilitation in which the entire pavement structure is milled up, crushed, blended, and placed back in order to provide a homogenous material that, when properly compacted, is suitable for use as a pavement base layer. This report discussed the techniques used, problems encountered, and lessons learned from the FDR project.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号