Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report, Ohio Valley Electric Corporation, Kyger Creek Power Station, Gallipolis, Ohio

机译:大坝安全煤燃烧表面蓄水评估(任务3)最终报告,俄亥俄谷电气公司,Kyger Creek电站,俄亥俄州加利波利斯

获取原文

摘要

CHA was contracted by Lockheed Martin (a contractor to the United State Environmental Protection Agency) to perform site assessments of selected coal combustion surface impoundments (Project 0-381 Coal Combustion Surface Impoundments/Dam Safety Inspections). As part of this contract, CHA was assigned to perform a site assessment of Ohio Valley Electric Corporations (OVEC) Bottom Ash and South Fly Ash Pond Dams at the Kyger Creek Station, located in Gallipolis, Gallia County, Ohio as shown on Figure 1 Project Location Map. CHA made a site visit on October 15, 2009 to inventory coal combustion waste surface impoundments at the facility, perform visual observations of the containment dikes, and collect relevant information regarding the site assessment.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号