首页> 美国政府科技报告 >Surface Infiltration Rates of Permeable Surfaces: Six Month Update (November 2009 through April 2010)
【24h】

Surface Infiltration Rates of Permeable Surfaces: Six Month Update (November 2009 through April 2010)

机译:透水表面的表面渗透率:六个月更新(2009年11月至2010年4月)

获取原文

摘要

At the end of October 2009, the Environmental Protection Agency (EPA) opened a parking lot on the Edison Environmental Center that included three parking rows of permeable pavement. The construction was a cooperative effort among EPA's Office of Administration and Resources Management, National Risk Management Research Laboratory, and the facility owner, Region 2. The lot serves as an active parking area for facility staff and visitors and also as a research platform. Key unknowns in the application of green infrastructure include the long term performance and the maintenance requirements. The perceived uncertainty in these is a barrier to widespread adoption of the installation of permeable surfaces for storm water management. EPA recognizes the need for credible long-term performance maintenance data and has begun a long-term monitoring effort on this installation. This document outlines the methods and results of the surface infiltration monitoring of the permeable parking surfaces during the first six months of operation.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号