首页> 美国政府科技报告 >Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report, Duke Energy Corporation, Miami Fort Generating Station, North Bend, Ohio
【24h】

Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report, Duke Energy Corporation, Miami Fort Generating Station, North Bend, Ohio

机译:大坝安全煤燃烧表面蓄水评估(任务3)最终报告,杜克能源公司,迈阿密堡发电站,北本德,俄亥俄州

获取原文

摘要

The Duke Energy Corporation Miami Fort Generating Station is located in the very southwest corner of the State of Ohio on the north shore of the Ohio River at the confluence with the Great Miami River as shown in Figure 1 Project Location Map. The facility is located within Hamilton County, Miami Township about five miles southwest of the village of North Bend, Ohio. The state boundary with Indiana is approximately 1900 feet to the west of the site and the boundary with the State of Kentucky lies just offshore within the Ohio River. The I-275 Bridge over the Ohio River is about one mile southwest of the site and can be seen in Photo No. 48. The City of Lawrenceburg, Indiana is approximately two miles downriver (southwest) of the site. CHA was contracted by Lockheed Martin (a contractor to the United State Environmental Protection Agency) to perform site assessments of selected coal combustion surface impoundments (Project 0-381 Coal Combustion Surface Impoundments/Dam Safety Inspections). As part of this contract, CHA was assigned to perform a site assessment of Ash Pond A and Ash Pond B at Duke Energy Corporation (Duke) Miami Fort Generation Station. This facility and the ponds were originally constructed by the Cincinnati Gas and Electric Company.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号