South Carolina Demonstration Project: Rapid Removal and Replacement of the SC 703 Ben Sawyer Bridge Over the Intracoastal Waterway in Charleston County.

机译:南卡罗来纳州示范项目:快速拆除和更换查尔斯顿县内陆水道上的sC 703 Ben sawyer大桥。

获取原文

摘要

As part of a national initiative sponsored by the Federal Highway Administration under the Highways for LIFE program, the South Carolina Department of Transportation (SCDOT) was awarded a waiver of state match incentive to demonstrate the use of proven, innovative technologies for accelerated bridge removal and replacement. This report documents accelerated bridge construction (ABC) techniques used to remove, widen, and replace the superstructure of the SC 703 bridge over the Intracoastal Waterway in less time than traditional construction methods. This report contains a description of the existing bridge and the materials and techniques used during construction. Prefabricated modular superstructure segments, four per span, were used to simplify and expedite the construction. Under conventional construction, the impact of this project on the traveling public was estimated at 8 months, but with the use of accelerated construction techniques, the impact was reduced to 10 days. Using ABC techniques added about $4.8 million to the initial construction cost of the project. However, a more comprehensive economic analysis including user cost savings shows that the project saved road users about $1.7 million (or 5 percent of the total project costs).

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号