首页> 美国政府科技报告 >Morrison Cove Water Resources Availability Study
【24h】

Morrison Cove Water Resources Availability Study

机译:莫里森湾水资源可用性研究

获取原文

摘要

The objectives of the Morrison Cove Water Resources Availability Study were to assess existing water resources, establish an estimated sustainable yield from the constituent watersheds, inventory current water uses, and evaluate water quantity and quality issues in the study area. Morrison Cove includes an area identified by the Susquehanna River Basin Commission (SRBC) as a Potentially Stressed Area and has a long history of agriculture-related water quality issues. A lack of flow data from USGS gaging stations within Morrison Cove has precluded quantitative water resource assessment.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号