首页> 美国政府科技报告 >Life Cycle and Economic Efficiency Analysis Phase II: Durable Pavement Markings
【24h】

Life Cycle and Economic Efficiency Analysis Phase II: Durable Pavement Markings

机译:生命周期和经济效率分析第二阶段:耐用的路面标记

获取原文

摘要

This report details the Phase II analysis of the life cycle and economic efficiency of inlaid tape and thermoplastic. Waterborne paint was included as a non-durable for comparison purposes only. In order to find the most economical product for specific traffic and weather conditions, the project examined the relationship between the pavement marking materials retroreflectivity and input variables. For three to four years, retroreflectivity data was collected from six locations in the state of Maryland. The sites were selected based on the amount of traffic and snowfall they received. Phase I of this study was done with one year of data, but that data collection period could not provide reasonable and reliable estimates of future retroreflectivity. As hoped, a two-year extension of the data collection period produced better estimates. The results of this research show that snowfall is a major factor in the deterioration of the retroreflectivity. The life cycle of each material was estimated under different conditions, and the installation cost of each material was estimated for the economic efficiency analysis.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号