首页> 美国政府科技报告 >Prediction of Pile Set-Up for Ohio Soils
【24h】

Prediction of Pile Set-Up for Ohio Soils

机译:俄亥俄土壤桩基沉降预测

获取原文

摘要

ODOT typically uses small diameter driven pipe piles for bridge foundations. When a pile is driven into the subsurface, it disturbs and displaces the soil. As the soil surrounding the pile recovers from the installation disturbance, a time dependant increase in pile capacity often occurs due to pile set-up. A significant increase in pile capacity could occur due to the set-up phenomenon. For optimization of the pile foundations, it is desirable to incorporate set-up in the design phase or predict the strength gain resulting from set-up so that piles could be installed at a lower End of Initial Driving (EOID) capacity. In order to address the set-up phenomena in Ohio geology, a research was conducted by compiling pile driving data in Ohio soils obtained from ODOT and GRL, an engineering company dedicated to dynamic pile load testing, located in Cleveland, Ohio. The set-up data of twenty three piles was compiled along with time, pile length, pile diameter. The liquid limit, plastic limit, average clay and silt content, average SPT value were compiled along the pile length. In 91 % cases of the driven piles, some degree of set-up was observed. Correlations among several soil parameters and pile capacities were explored. An equation was proposed between the final and initial load capacities of the piles as a function of time and shown to be in good agreement with the strength gains of driven pipe piles in Ohio soils.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号