首页> 美国政府科技报告 >Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions. National Cooperative Highway Research Program (NCHRP) Report 698
【24h】

Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions. National Cooperative Highway Research Program (NCHRP) Report 698

机译:加速桥梁施工连接在中高地震区的应用。国家合作公路研究计划(NCHRp)报告698

获取原文

摘要

This report identifies promising details to be used for connections of bridge members in accelerated bridge construction in medium to high seismic regions and gives recommendations for further research. Existing connection details were gathered from state departments of transportation (DOTs), industry, and academia and were evaluated for their performance in terms of readiness for use, construction risk, durability, and seismic performance. The material in this report will be of immediate interest to bridge engineers.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号