NCHRP Web-Only Document 183: Guide for Managing NEPA-Related and Other Risks in Project Delivery

机译:NCHRp仅限Web的文档183:项目交付中管理NEpa相关风险和其他风险的指南

获取原文

摘要

The planning, design, and construction of highway projects is complex and subject to considerable uncertainty. These uncertainties stem primarily from a lack of information about the conditions assumed for developing project estimates and from unforeseen changes or problems that arise as a project develops. These uncertainties lead to difficulty in accurately predicting project performance, including cost and schedule. The National Environmental Policy Act (NEPA) has been a fixture of transportation project development for decades. When NEPA regulations first came to the fore in the 1970s, state departments of transportation (DOTs) generally managed the NEPA process and documentation separately from planning and preliminary development.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号