首页> 美国政府科技报告 >Project Mohole-Phase II. Stage 'A' Report. Testing of Sidewall Coring Tool
【24h】

Project Mohole-Phase II. Stage 'A' Report. Testing of Sidewall Coring Tool

机译:项目mohole-phase II。阶段'a'报告。侧壁取心工具的测试

获取原文

摘要

The results of the tests clearly reveal that the concept of the sidewall coring tool for use in Project Mohole is feasible and practical, that it may be designed to operate satisfactorily on the end of a logging cable in the Mohole environment, and that a 5-foot long triangular sidewall core specimen, approximately 1-1/2 inches to the side at its cross section, may be cut in a hole having a minimum diameter of 7-5/8 inches. It also was established that other complementary downhole equipment, such as an orientation device or a standard logging sonde, could be operated in conjunction with the sidewall coring tool. The design parameters and general tool configuration for a prototype sidewall coring tool applicable to Project Mohole are submitted for consideration. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号