首页> 美国政府科技报告 >Field Investigation of a Continuous Composite Prestressed I-Beam Highway Bridge Located in Jefferson County, Illinois
【24h】

Field Investigation of a Continuous Composite Prestressed I-Beam Highway Bridge Located in Jefferson County, Illinois

机译:位于伊利诺伊州杰斐逊县的连续组合预应力工字梁公路桥梁的现场调查

获取原文

摘要

Measurements of camber and strain in a prestressed concrete highway bridge were made over a period of 3.3 years. The bridge was made using precast, pretensioned I-beams which were made continuous for live-loads by reinforcement in the cast-in-place deck. The initial camber of about one in. in 72-ft span girders increased by about 75 percent within the first few weeks after release, and then changed only slowly. Only minor movements have occurred since the deck was cast. The same general trends have been observed in the strain measurements, with only small changes occurring after about two years. The shortening of the girders has amounted to slightly over one-in., in addition to temperature effects. Strain measurements on the bridge and on creep and shrinkage specimens indicate that the concrete undergoes expansion and contraction on an annual cycle, apparently in response to the increased average relative humidity during the winter months and the lower humidity during the summer. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号