Evaluation of Experimental Towers in the 230-Kv Glen Canyon-Shiprock Transmission Line

机译:230kv Glen Canyon-shiprock输电线路实验塔的评估

获取原文

摘要

Results of a 6 year investigation program of new tower designs and erection procedures for transmission lines are reported. The 7-mile test section of a 230-kv transmission line near Kayenta, Arizona, consisted of 4 towers each of 7 different types, some erected by cranes and some by helicopter. Installed cost data are given. The 6-year service reliability was satisfactory for this experimental section of transmission line. Feasibility of helicopter erection was satisfactorily demonstrated. Tower designs based on guyed construction were acceptable. Self-supporting towers were found to be most economical. Environmentally, use of guyed towers should be avoided near substations, highways or in agricultural fields. Basic design data of the transmission line and tower design data are given. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号