首页> 美国政府科技报告 >B.E.S.T. Pilot Study. Bridge Engineering System for TIES.
【24h】

B.E.S.T. Pilot Study. Bridge Engineering System for TIES.

机译:最好。试验研究。 TIEs桥梁工程系统。

获取原文

摘要

A prototype integrated bridge design system was developed on a Burroughs 5500computer system. The acronym B.E.S.T. stands for Bridge Engineering Subsystems for T.I.E.S. This subsystem was originally developed under a former project called Total Integrated Engineering System (T.I.E.S.). The computational part of the system consists of the following seven programs: control geometry,framing plan,reinforced concrete slab design,beam and girder design,bridge bearing design,abutment and retaining wall design and pier design. The system also includes Calcomp Drum Plotter programs for plotting: general plan of bridge,framing plan,transverse section,beam and girder schedules,abutment details,pier details and slab bar plan for straight bridges. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号