首页> 美国政府科技报告 >The Optimization of the Vertical Alignment of the M5 Motorway from Chelston to Blackbrook,
【24h】

The Optimization of the Vertical Alignment of the M5 Motorway from Chelston to Blackbrook,

机译:从Chelston到Blackbrook的m5高速公路垂直线形的优化,

获取原文

摘要

The report describes test runs,on a section of the M.5motorway,running from Chelston to Blackbrook,of computer programs developed at the TRRL to optimize a vertical alignment with respect to costs of earthworks. It describes the phasing of the vertical alignment with the horizontal alignment. The costs of earthworks are given.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号