首页> 美国政府科技报告 >Freeway Operations Study -Phase III. Analytical Techniques for Ramp Control.
【24h】

Freeway Operations Study -Phase III. Analytical Techniques for Ramp Control.

机译:高速公路运营研究 - 第三阶段。斜坡控制分析技术。

获取原文

摘要

The report documents the development of a computerized analytical technique to determine the optimum metering rates for a group of on-ramps on the California urban freeways. Two sub-models are identified and these together with the initial freeway model are integrated into a single computer program, RAMPCON. The user has the flexibility of maximizing either total output or total vehicle miles as the objective. Limitations of the program are discussed and results of a test system are presented. (Author Modified Abstract)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号