Cost Comparison Between Subterrene and Current Tunneling Methods. Appendix B. Subterrene Cost Analyses.

机译:subterrene与当前隧道施工方法的成本比较。附录B. subterrene成本分析。

获取原文

摘要

A study was made to compare tunnel construction costs between the Subterrene tunneling system and methods currently in use. Three completed tunnels were selected for study cases to represent finished diameters ranging from 3.05meters (10feet) to 6.25meters (20.5feet). A conceptual nuclear powered Subterrene tunneling machine (NSTM) was designed. It was assumed that NSTM's were available for each of the three baseline tunnels. Costs were estimated (shown in Appendix B) for the baseline tunnels driven by NSTM. Savings of 12percent for the 4.73meter (15.5foot) tunnel and 6percent for the 6.25meter (20.5foot) tunnel were found to be possible using the NSTM as compared to current methods. A penalty of 30percent was found for the 3.05meter (10foot) tunnel using the NSTM. The cost advantage for the NSTM results from the combination of (a) a capital rather than labor intensive system,and (b) formation of both initial support and final lining in conjuction with the excavation process.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号