首页> 美国政府科技报告 >Walk-Through Survey of Capacitor Production Operation, Westinghouse Electric Corporation, Bloomington, Indiana on December 4, 1975
【24h】

Walk-Through Survey of Capacitor Production Operation, Westinghouse Electric Corporation, Bloomington, Indiana on December 4, 1975

机译:1975年12月4日,印第安纳州布卢明顿市西屋电气公司对电容器生产运行的总结调查

获取原文

摘要

A walk-through survey was conducted at the Capacitor Production Operation, Westinghouse Electric Corporation, Bloomington, Indiana, on December 4, 1975, to determine if a mortality study of workers exposed to polychlorinated biphenyls at this facility would be feasible. The plant and current processes in the capacitor making operation are described. Information is given on the medical program, personnel records, and environmental monitoring. Due to the amount of time required to search all the records and the practice of destroying old records, walk-though surveys of other facilities should be conducted.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号