首页> 美国政府科技报告 >Nuclear Powered Tanker. Maritime Design Study for 600,000 DWT Nuclear Tanker. Volume 3. Ship Safety.
【24h】

Nuclear Powered Tanker. Maritime Design Study for 600,000 DWT Nuclear Tanker. Volume 3. Ship Safety.

机译:核动力油轮。 600,000 DWT核电站的海上设计研究。第3卷。船舶安全。

获取原文

摘要

The study extended over a period of approximately six months. In terms of budgetary estimates,an economic evaluation was performed for ship construction cost,ship refueling and drydocking cost,first of a kind ship construction cost,ship manning cost,and contingencies. Additionally,recommendations are made as a result of the ship safety studies.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号