首页> 美国政府科技报告 >Northeast Corridor High Speed Rail Passenger Service Improvement Project. Task 16:Electrification Systems and Standards.
【24h】

Northeast Corridor High Speed Rail Passenger Service Improvement Project. Task 16:Electrification Systems and Standards.

机译:东北走廊高铁客运改善工程。任务16:电气化系统和标准。

获取原文

摘要

The report studies catenary systems for the 150mile/h train service proposed for the Northeast Corridor with electrification at 25kV 60Hz. Following a review of high speed catenaries, a computer simulation is used to show that current collection by multiple unit trains fitted with existing pantographs,running under existing catenaries between Washington and New Haven,will be satisfactory only at temperatures typically within the range 40F to 90F. Some deterioration will occur outside this range. Recommendations include minor modifications to catenaries between Washington and New York,and between Stamford and New Haven;major changes to the catenary between New York and Stamford,and development of a pantograph with improved dynamic performance.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号