Reducing Nuclear Powerplant Leadtimes:Many Obstacles Remain:Nuclear Regulatory Commission.

机译:减少核动力装置的交付时间:许多障碍仍然存在:核管理委员会。

获取原文

摘要

Today's large nuclear powerplants cost from $700million to $1billion to construct. Much of this cost--up to 40percent,according to one study--is interest and inflation encountered during the 10or more years of leadtime--the timespan from the date a utility decides to build a plant until the date it becomes operational. Presently,high capital costs have contributed to many utilities'decisions to defer or cancel construction of planned units. Thus,the leadtimes for constructing nuclear powerplants are important factors in the economics of nuclear power,and any reductions in the present 10-year cycle would reduce capital costs and enable a utility to more quickly begin recovering the cost of the plant. Reduced leadtimes would also provide earlier on-line electrical power to meet increased energy demands. For several years the President and the Joint Committee on Atomic Energy have been concerned about the lengthy leadtimes and the President has requested the Nuclear Regulatory Commission to take steps to reduce them. NRC has in recent years implemented certain administrative changes in an attempt to reduce nuclear powerplant leadtimes from 10years to 7to 8years without compromising safety.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号