首页> 美国政府科技报告 >Two-Course Bonded Concrete Bridge Deck Construction. Interim Report no. 2. Concrete Properties and Deck Condition Prior to Opening to Traffic.
【24h】

Two-Course Bonded Concrete Bridge Deck Construction. Interim Report no. 2. Concrete Properties and Deck Condition Prior to Opening to Traffic.

机译:双层粘结混凝土桥面板施工。中期报告编号2.交通开放前的混凝土特性和甲板条件。

获取原文

摘要

Presented in this report is information concerning the characteristics of the concretes used to construct six experimental two-course bonded bridge decks in Virginia. The quality of the overlay concretes produced under standard specifications supplemented with special contract provisions is described. Recommendations are made concerning the attainment of desired cover depths over the topmost reinforcement and the attainment of adequate consolidation in the overlays. The several procedures that have been used to compare the condition of the two-course decks with that of conventional,single-lift control decks are discussed,and it is concluded that the two-course decks indicate a greater potential for satisfactory performance. Determinations of future performance will be based on comparisons of data from tests as visual surveys and soundings,chloride analyses,electrical potentials,sonic pulse velocities,and skid resistance of the decks.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号