TVA's 1-MW Pilot Plant:Final Report on High-Velocity Scrubbing and Vertical Duct Mist Elimination.

机译:TVa的1兆瓦试验工厂:关于高速洗涤和垂直管道消除雾的最终报告。

获取原文

摘要

The report describes the systematic test program that led to the development of washing techniques that maintain continuous mist eliminator performance for lime/limestone closed-loop scrubbing systems. TVA recently demonstrated the techniques at its 1-MW pilot plant at the Colbert Power Plant. The report also describes high-velocity scrubbing tests performed in conjunction with the mist eliminator tests. Continuous operation of the chevron mist eliminator,positioned horizontally in a vertical duct,in the limestone system was maintained (after extensive testing at 12.6ft/sec) by washing the bottom of the mist eliminator intermittently with all the available clarified liquor,immediately followed by an allocated amount of makeup water. The top of the mist eliminator was washed intermittently with the remaining allocation of allowable makeup water. At a gas velocity of 16ft/sec,the scrubber operated more efficiently and mist eliminator performance was improved. Continuous mist eliminator performance in the lime system was maintained at 12.5and 16ft/sec by washing the bottom of the mist eliminator intermittently with an allocated amount of allowable makeup water. The remainder of the allocated makeup water was used to intermittently wash the top of the mist eliminator.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号