首页> 美国政府科技报告 >Postmining Alternative Land Use Evaluation Methodology
【24h】

Postmining Alternative Land Use Evaluation Methodology

机译:推迟替代土地利用评价方法

获取原文

摘要

The report summarizes the results of work performed by Harbridge House, Inc., pursuant to Purchase Order No. P5190176. It includes study observations, additional needs to be met, and ways to meet those needs. In performing the study, Harbridge House focused on the following three tasks, as identified by the Office of Surface Mining Reclamation and Enforcement: A literature search and preliminary survey of several states to determine the extent of available information on reclamation projects, the development of a list of successful and unsuccessful land reclamation projects that involved a change in postmining land use, and recommendations on criteria and methodologies for evaluating alternative land uses in planned reclamation projects.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号