Bridge Deck Restoration Methods and Procedures,Part III. Exposed Membrane Seals on Bridge Decks.

机译:桥面修复方法和程序,第三部分。桥面板上的外露膜密封。

获取原文

摘要

This report evaluates some 25installations of bridge deck exposed membrane seals. Each installation is discussed in detail and a test performance record for each is included. Each installation is rated as acceptable or not acceptable. All installations of one membrane type are collectively evaluated as to the suitability of that membrane for contract useage or for further testing. All California Standard Specification epoxy installations are evaluated as failures. A proprietary epoxy asphalt chip seal is rated as a failure in 3test installations due to porosity,although aggregate retention was good. A proprietary urethane is rated as a failure in 4test installations due to porosity and poor aggregate retention with one installation debonding extensively from the deck. Another proprietary urethane (PRC 445/440) is rated as a fully successful exposed membrane and is recommended for contract use.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号