首页> 美国政府科技报告 >Field Evaluation of Fracture Control in Tunnel Blasting
【24h】

Field Evaluation of Fracture Control in Tunnel Blasting

机译:隧道爆破中裂缝控制的现场评价

获取原文

摘要

The objective of this research was to implement fracture control procedures in a tunnel project and to assess the practicality, advantages, disadvantages, performance and cost effectiveness of fracture control methods against smooth blasting procedures. This report describes the procedures and results of field tests of fracture control--a procedure for achieving fracture plane control in tunnel blasting. It describes and discusses the project and site geology, the theory and applications of fracture control blasting, and the experimental procedures used. The report provides conclusions and recommendations for future research. The procedures and results of an experimental smooth blasting round utilizing milli-second delay detonating caps are described in Appendix A.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号