首页> 美国政府科技报告 >Subsurface Investigations,Sections C010a and C010d,Huntington Route,Supplementary.
【24h】

Subsurface Investigations,Sections C010a and C010d,Huntington Route,Supplementary.

机译:地下调查,C010a和C010d,亨廷顿路线,补充。

获取原文

摘要

Results are summarized of two groups of test borings,one group of 11made in Section C010a near the King Street Station and the other of five borings at the parking lot of Huntington Station of C010d of the Washington Metropolitan Area Metro System. Both exploration programs were carried out to investigate conditions encountered during construction. Therefore the reports are presented in somewhat different format than usual without formal contract boring logs or elaborate geologic sections. However,the report is complete with the additional boring logs,the test information and a summary of general conclusions that were made available to the section designer for investigating problems that arose during construction.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号