首页> 美国政府科技报告 >Full-Scale Dual-Alkali Demonstration System at Louisville Gas and Electric Co. - Final Design and System Cost
【24h】

Full-Scale Dual-Alkali Demonstration System at Louisville Gas and Electric Co. - Final Design and System Cost

机译:路易斯维尔燃气和电力公司的全尺寸双碱示范系统 - 最终设计和系统成本

获取原文

摘要

The report describes phase 2 of a 4-phase demonstration program involving the dual alkali process for controlling SO2 emissions from Unit 6, a coal-fired boiler at Louisville Gas and Electric Co.'s Can Run Station. The program consists of four phases: (1) preliminary design and cost estimation; (2) engineering design, construction, and mechanical testing; (3) startup and performance testing; and (4) 1-year operation and test programs. The report describes final engineering design, construction and mechanical testing, and installed system capital cost. Construction of the system was completed in February 1979 and system startup was initiated in March 1979. Total capital investment for the entire plant, including waste disposal, is estimated to be $20.4 million (Construction of the waste disposal facilities is not complete).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号