首页> 美国政府科技报告 >Supplement to Project Geology Report:Auburn Dam. Seismic Evaluation of Auburn Damsite. Volume 3:Study of Dike/Fault Intersections Northwest Portion of the Auburn Damsite,
【24h】

Supplement to Project Geology Report:Auburn Dam. Seismic Evaluation of Auburn Damsite. Volume 3:Study of Dike/Fault Intersections Northwest Portion of the Auburn Damsite,

机译:项目地质报告补充:奥本大坝。奥本坝址的抗震评估。第3卷:auburn Damsite西北部堤坝/断层交叉口的研究,

获取原文

摘要

This report presents the results of the geologic investigation of the structural relationships between two major faults and intrusive dikes which intersect these faults in the Auburn Damsite area. These dikes are part of a complex network of several dike types intruded during different ages. Geologic relationships in the damsite area and specific study areas, a discussion of the mechanics of dike emplacement and intrussive phenomena;and the use of the dikes to determine magnitude,direction and probable age of net slip for two principal faults are discussed. Appended to the report are 20geologic drawings,many of which are at scales of 1-inch equals 1-foot,which are color printed and oversize. These drawings cannot be included in the microfilm copies but are available upon request from the U.S. Bureau of Reclamation.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号