首页> 美国政府科技报告 >Grouting Horizontal Drainage Holes in Coalbeds
【24h】

Grouting Horizontal Drainage Holes in Coalbeds

机译:煤层注浆水平排水孔

获取原文

摘要

This report describes a method developed by the Bureau of Mines for sealing horizontal degasification holes so that they do not create a gas explosion hazard when intercepted by mining. A cement slurry is pumped into the hole through an injection pipe that extends to the back of the hole. Pumping continues until the slurry returns through the annulus to the hole collar. The hole is then shut in and the grout allowed to harden. Application of the procedure to six horizontal degasification holes at Eastern Associated Coal Corp.'s Honey Run shaft is discussed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号